Upload the MPP or XML file
Create a free account, then upload a Microsoft Project .mpp file or a Project XML .xml export from another planning tool.
Upload a Microsoft Project XML or MPP file and view it online as an editable Gantt chart. You do not need Microsoft Project installed to review tasks, dates, dependencies, resources, and schedule logic.
Preview or download the sample without signup. Uploading your own file requires an account. New accounts get a 14-day trial. See editing and export access.
This fictional equipment installation has 8 tasks, 8 finish-to-start links and one handover milestone. The downloads and preview use the same dates and dependencies. No signup is needed to preview or download.
| ID | Task name | Days | Start | Finish | Predecessors | Gantt preview Nov 2 Nov 15 |
|---|---|---|---|---|---|---|
| 1 | Confirm installation scope | 1 | 2026-11-02 | 2026-11-02 | — | |
| 2 | Prepare the site | 2 | 2026-11-03 | 2026-11-04 | 1 | |
| 3 | Deliver equipment | 4 | 2026-11-03 | 2026-11-06 | 1 | |
| 4 | Install equipment | 3 | 2026-11-07 | 2026-11-09 | 2, 3 | |
| 5 | Connect power and controls | 2 | 2026-11-10 | 2026-11-11 | 4 | |
| 6 | Run commissioning tests | 2 | 2026-11-12 | 2026-11-13 | 5 | |
| 7 | Complete final inspection | 1 | 2026-11-14 | 2026-11-14 | 6 | |
| 8 | Handover milestone | 0 | 2026-11-15 | 2026-11-15 | 7 |
Example assumptions: calendar days, including weekends; 8 hours per day; no holidays. Positive-duration finish dates include the last workday. The zero-day milestone is on November 15. Check your own calendar after import.
Import a sample, then review its task count, dates and links. To test a delay, extend “Deliver equipment” from 4 to 6 days and review the downstream dates. With these links and the same calendar, the handover moves from November 15 to November 17. Save, reopen and check your exported file before using it.
Explore a larger, read-only construction demo or learn how to review schedule revisions.
Create a free account, then upload a Microsoft Project .mpp file or a Project XML .xml export from another planning tool.
GanttPilot turns the imported file into task rows, dates, milestones, dependencies, and a browser-based Gantt chart.
Read the import report and check dates, links and calendars against the source. After editing, export Project XML with the access included in your plan. Native MPP export is not supported.
This Microsoft Project viewer is an entry point into the full GanttPilot editor. You can inspect the schedule, make changes, and keep the plan structured for Project XML handoff.
Inspect WBS, task names, durations, start dates, finish dates, and milestone rows.
Move schedule work from a static file into an editable browser timeline.
Keep a path back to Microsoft Project compatible XML after the plan is reviewed.
The page preview, sample XML download and larger public live demo are available without signing in. Your own file upload requires an account. New accounts get a 14-day trial; continued editing and export access depend on your plan. See Pricing for current limits.
No. You can upload a Microsoft Project XML file or MPP file and view the schedule online in the browser.
Yes. GanttPilot can import Microsoft Project .mpp files and Project XML .xml files, then open the result as an editable Gantt chart.
Yes. The XML import opens inside the GanttPilot workspace so you can edit tasks, dates, dependencies, resources, and schedule details.
No. The goal is to view the XML as an editable Gantt chart, not just display a static file preview.
Yes. Export Project XML with the access included in your plan. GanttPilot does not export native .mpp files. Check Pricing for current export limits.
Yes. Upload an .mpp file through this browser-based viewer after signing in. You do not need Microsoft Project installed. Review the import report and compare the result with the source schedule before making changes.
GanttPilot opens Project XML and exports Project XML. It does not generate native .mpp files. To get an MPP file, open the exported XML in Microsoft Project and use its Save As option for MPP.
Import the MPP file, review the imported schedule, then export Project XML with your plan's export access. This is a schedule conversion, not a guarantee that every Microsoft Project field is preserved.
Check the import report and spot-check task dates, dependencies and calendars. MPP is converted through Project XML; calendars and working times are mapped to GanttPilot's working-day model. Custom fields, calendar exceptions and resource rates need checking in the source application.
Use a Microsoft Project-compatible XML export containing a project and task data. An arbitrary XML document or renamed file is not a schedule. Re-export from the source planning software and check any import error. For spreadsheet task lists, use Excel to Gantt instead.
Start with an MS Project schedule template, or check the Project XML handoff workflow. For an Excel or CSV task list, use Excel to Gantt.