<?xml version='1.0' encoding='UTF-8'?>
<Project xmlns="http://schemas.microsoft.com/project">
  <SaveVersion>14</SaveVersion>
  <BuildNumber>16.0.0.0</BuildNumber>
  <Name>schedule-import-example</Name>
  <GUID>E7F5EA07-E3F2-56C9-93D9-FFBF17C35F98</GUID>
  <Title>schedule-import-example</Title>
  <CreationDate>2026-10-16T14:00:47</CreationDate>
  <LastSaved>2026-10-16T14:00:47</LastSaved>
  <ScheduleFromStart>1</ScheduleFromStart>
  <StartDate>2026-11-02T08:00:00</StartDate>
  <FinishDate>2026-11-15T08:00:00</FinishDate>
  <FYStartDate>1</FYStartDate>
  <CriticalSlackLimit>0</CriticalSlackLimit>
  <CurrencyDigits>2</CurrencyDigits>
  <CurrencySymbol>¥</CurrencySymbol>
  <CurrencyCode>CNY</CurrencyCode>
  <CurrencySymbolPosition>0</CurrencySymbolPosition>
  <DefaultStartTime>08:00:00</DefaultStartTime>
  <DefaultFinishTime>17:00:00</DefaultFinishTime>
  <MinutesPerDay>480</MinutesPerDay>
  <MinutesPerWeek>3360</MinutesPerWeek>
  <DaysPerMonth>30</DaysPerMonth>
  <DurationFormat>7</DurationFormat>
  <DefaultTaskType>1</DefaultTaskType>
  <NewTasksAreManual>0</NewTasksAreManual>
  <NewTasksEffortDriven>0</NewTasksEffortDriven>
  <NewTasksEstimated>0</NewTasksEstimated>
  <WeekStartDay>1</WeekStartDay>
  <CurrentDate>2026-10-16T14:00:47</CurrentDate>
  <HonorConstraints>1</HonorConstraints>
  <InsertedProjectsLikeSummary>1</InsertedProjectsLikeSummary>
  <MultipleCriticalPaths>0</MultipleCriticalPaths>
  <TaskUpdatesResource>1</TaskUpdatesResource>
  <Autolink>0</Autolink>
  <ProjectExternallyEdited>0</ProjectExternallyEdited>
  <UpdateManuallyScheduledTasksWhenEditingLinks>1</UpdateManuallyScheduledTasksWhenEditingLinks>
  <KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled>0</KeepTaskOnNearestWorkingTimeWhenMadeAutoScheduled>
  <CalendarUID>1</CalendarUID>
  <Calendars>
    <Calendar>
      <UID>1</UID>
      <Name>Imported calendar day calendar</Name>
      <IsBaseCalendar>1</IsBaseCalendar>
      <BaseCalendarUID>-1</BaseCalendarUID>
      <WeekDays>
        <WeekDay>
          <DayType>1</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>2</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>3</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>4</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>5</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>6</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
        <WeekDay>
          <DayType>7</DayType>
          <DayWorking>1</DayWorking>
          <WorkingTimes>
            <WorkingTime>
              <FromTime>08:00:00</FromTime>
              <ToTime>12:00:00</ToTime>
            </WorkingTime>
            <WorkingTime>
              <FromTime>13:00:00</FromTime>
              <ToTime>17:00:00</ToTime>
            </WorkingTime>
          </WorkingTimes>
        </WeekDay>
      </WeekDays>
    </Calendar>
  </Calendars>
  <Tasks>
    <Task>
      <UID>0</UID>
      <ID>0</ID>
      <Name>schedule-import-example</Name>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CalendarUID>1</CalendarUID>
      <Start>2026-11-02T08:00:00</Start>
      <Finish>2026-11-15T17:00:00</Finish>
      <Duration>PT112H0M0S</Duration>
      <ManualStart>2026-11-02T08:00:00</ManualStart>
      <ManualFinish>2026-11-15T17:00:00</ManualFinish>
      <ManualDuration>PT112H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Manual>0</Manual>
      <Estimated>0</Estimated>
      <Summary>1</Summary>
    </Task>
    <Task>
      <UID>1</UID>
      <ID>1</ID>
      <Name>Confirm installation scope</Name>
      <GUID>D48350F5-44C2-5509-BD56-2AE33D9EAC69</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>1</WBS>
      <OutlineNumber>1</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-02T08:00:00</Start>
      <Finish>2026-11-02T17:00:00</Finish>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2026-11-02T08:00:00</ManualStart>
      <ManualFinish>2026-11-02T17:00:00</ManualFinish>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingDuration>PT8H0M0S</RemainingDuration>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
    </Task>
    <Task>
      <UID>2</UID>
      <ID>2</ID>
      <Name>Prepare the site</Name>
      <GUID>F680BBB1-065F-5D9C-9E57-3D2E85EF7826</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>2</WBS>
      <OutlineNumber>2</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-03T08:00:00</Start>
      <Finish>2026-11-04T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <ManualStart>2026-11-03T08:00:00</ManualStart>
      <ManualFinish>2026-11-04T17:00:00</ManualFinish>
      <ManualDuration>PT16H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <RegularWork>PT16H0M0S</RegularWork>
      <RemainingDuration>PT16H0M0S</RemainingDuration>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>1</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>3</UID>
      <ID>3</ID>
      <Name>Deliver equipment</Name>
      <GUID>0952743C-4DF8-5FAA-8EC8-734AA68FB0E9</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>3</WBS>
      <OutlineNumber>3</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-03T08:00:00</Start>
      <Finish>2026-11-06T17:00:00</Finish>
      <Duration>PT32H0M0S</Duration>
      <ManualStart>2026-11-03T08:00:00</ManualStart>
      <ManualFinish>2026-11-06T17:00:00</ManualFinish>
      <ManualDuration>PT32H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT32H0M0S</Work>
      <RegularWork>PT32H0M0S</RegularWork>
      <RemainingDuration>PT32H0M0S</RemainingDuration>
      <RemainingWork>PT32H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>1</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>4</UID>
      <ID>4</ID>
      <Name>Install equipment</Name>
      <GUID>2DC5C4A9-D0CE-5F1C-AE77-81AA95EE8CD5</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>4</WBS>
      <OutlineNumber>4</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-07T08:00:00</Start>
      <Finish>2026-11-09T17:00:00</Finish>
      <Duration>PT24H0M0S</Duration>
      <ManualStart>2026-11-07T08:00:00</ManualStart>
      <ManualFinish>2026-11-09T17:00:00</ManualFinish>
      <ManualDuration>PT24H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT24H0M0S</Work>
      <RegularWork>PT24H0M0S</RegularWork>
      <RemainingDuration>PT24H0M0S</RemainingDuration>
      <RemainingWork>PT24H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>2</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
      <PredecessorLink>
        <PredecessorUID>3</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>5</UID>
      <ID>5</ID>
      <Name>Connect power and controls</Name>
      <GUID>C3CCAAF6-FC17-5367-A386-CD032672F78C</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>5</WBS>
      <OutlineNumber>5</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-10T08:00:00</Start>
      <Finish>2026-11-11T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <ManualStart>2026-11-10T08:00:00</ManualStart>
      <ManualFinish>2026-11-11T17:00:00</ManualFinish>
      <ManualDuration>PT16H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <RegularWork>PT16H0M0S</RegularWork>
      <RemainingDuration>PT16H0M0S</RemainingDuration>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>4</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>6</UID>
      <ID>6</ID>
      <Name>Run commissioning tests</Name>
      <GUID>37FEEFBF-A7A3-5666-A216-0BAEE3EA1A5C</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>6</WBS>
      <OutlineNumber>6</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-12T08:00:00</Start>
      <Finish>2026-11-13T17:00:00</Finish>
      <Duration>PT16H0M0S</Duration>
      <ManualStart>2026-11-12T08:00:00</ManualStart>
      <ManualFinish>2026-11-13T17:00:00</ManualFinish>
      <ManualDuration>PT16H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT16H0M0S</Work>
      <RegularWork>PT16H0M0S</RegularWork>
      <RemainingDuration>PT16H0M0S</RemainingDuration>
      <RemainingWork>PT16H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>5</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>7</UID>
      <ID>7</ID>
      <Name>Complete final inspection</Name>
      <GUID>3CD79CC8-C8CE-5DD5-837F-B3CCBC86EB26</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>7</WBS>
      <OutlineNumber>7</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-14T08:00:00</Start>
      <Finish>2026-11-14T17:00:00</Finish>
      <Duration>PT8H0M0S</Duration>
      <ManualStart>2026-11-14T08:00:00</ManualStart>
      <ManualFinish>2026-11-14T17:00:00</ManualFinish>
      <ManualDuration>PT8H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT8H0M0S</Work>
      <RegularWork>PT8H0M0S</RegularWork>
      <RemainingDuration>PT8H0M0S</RemainingDuration>
      <RemainingWork>PT8H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>0</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>6</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
    <Task>
      <UID>8</UID>
      <ID>8</ID>
      <Name>Handover milestone</Name>
      <GUID>8A4916E6-8131-54FD-8D5F-95B9CE59BA09</GUID>
      <Type>1</Type>
      <IsNull>0</IsNull>
      <CreateDate>2026-10-16T14:00:47</CreateDate>
      <CalendarUID>1</CalendarUID>
      <WBS>8</WBS>
      <OutlineNumber>8</OutlineNumber>
      <OutlineLevel>1</OutlineLevel>
      <Priority>500</Priority>
      <Active>1</Active>
      <Manual>0</Manual>
      <Start>2026-11-15T08:00:00</Start>
      <Finish>2026-11-15T08:00:00</Finish>
      <Duration>PT0H0M0S</Duration>
      <ManualStart>2026-11-15T08:00:00</ManualStart>
      <ManualFinish>2026-11-15T08:00:00</ManualFinish>
      <ManualDuration>PT0H0M0S</ManualDuration>
      <DurationFormat>7</DurationFormat>
      <Work>PT0H0M0S</Work>
      <RegularWork>PT0H0M0S</RegularWork>
      <RemainingDuration>PT0H0M0S</RemainingDuration>
      <RemainingWork>PT0H0M0S</RemainingWork>
      <EffortDriven>0</EffortDriven>
      <Estimated>0</Estimated>
      <Summary>0</Summary>
      <Milestone>1</Milestone>
      <PercentComplete>0</PercentComplete>
      <PercentWorkComplete>0</PercentWorkComplete>
      <Rollup>0</Rollup>
      <Cost>0</Cost>
      <FixedCost>0</FixedCost>
      <OverAllocated>0</OverAllocated>
      <ConstraintType>0</ConstraintType>
      <Notes />
      <PredecessorLink>
        <PredecessorUID>7</PredecessorUID>
        <Type>1</Type>
        <CrossProject>0</CrossProject>
        <LinkLag>0</LinkLag>
        <LagFormat>7</LagFormat>
      </PredecessorLink>
    </Task>
  </Tasks>
  <Resources>
    <Resource>
      <UID>0</UID>
      <ID>0</ID>
      <Name />
      <Type>1</Type>
      <IsNull>1</IsNull>
    </Resource>
  </Resources>
  <Assignments />
</Project>